The 20-item concrete bid checklist

Print this page, write one bid per column, and fill in what each bid says for every line. A blank cell is a question to ask the bidder before you decide. The lines come from the city standards, the Portland Cement Association and the Texas Attorney General's consumer guidance cited across this site.

Updated November 10, 2026 · Metroplex Concrete & Stone

How to use it: a bid does not have to be perfect on every line to be a fair bid, but it does have to answer every line. If a bidder cannot fill a cell, ask. If the answer is "we always do it right," ask for it in writing. Compare the spec first and the price second; the guides on reading a bid and what moves the price explain each line.

LineBid 1Bid 2Bid 3Ours
Scope
1. Drawing or sketch with dimensions and a north arrow
No drawing, no comparison.
2. Which panels or areas are replaced, which are left
Marked on the drawing.
3. Tear-out and haul-off included
And disposal fees.
4. What is protected
Garage slab, irrigation, trees, the neighbor's drive, the approach.
Spec
5. Slab thickness, per section
Drive, approach, edge, pad, dumpster apron.
6. Steel: bar size and spacing, or mesh gauge
Set on chairs; tied at crossings.
7. Base: material, depth, compaction
Topsoil removed first.
8. Joints: spacing, saw-cut or tooled, depth
About two times thickness in feet (PCA).
9. Expansion or isolation joints
At the house, garage, approach and any structure.
10. Dowels into existing concrete
Size, length, embedment.
Finish and cure
11. Finish named
Broom, exposed aggregate, stamped pattern, color method, sealer, grit.
12. Curing method
Compound or wet cure; summer start time.
13. Dates
Pour, foot traffic, cars, heavy vehicles.
Site
14. Drainage direction and slope
Where downspouts and sprinkler heads end up.
15. Access
Pump, wheelbarrow, truck staging; any surcharge.
Paper
16. Permits: which ones, who pulls, fees in or out
Approach, flatwork, county development.
17. HOA drawing and submittal
Contingent on approval?
18. Certificate of insurance before work
Current, naming the contractor.
19. Lien releases with each payment; deposit and progress terms
Never full payment before inspection (Texas AG).
20. Written warranty: what, how long, what voids it
Verbal is not a warranty.

References: City of Fort Worth, Parkway Standards (driveway approaches and sidewalks) · Portland Cement Association, FAQ: joints, what type are used and where · Texas Attorney General, how to avoid home improvement scams · City of Dallas, paving permit checklist (drive approach, sidewalk, curb and gutter)

Want a fourth column filled in? Request a written quote and it arrives with every one of these lines answered, from one independent, insured North Texas contractor.

Get a complete written quote →

One more bid, written to the spec

Get a quote you can hold the others against.

Tell us the job and where it is. One independent, insured North Texas contractor will look at it and send a written quote with thickness, steel, base, joints, finish, permits and dates on it.

Residential and commercial, in all eleven DFW counties. No price on this site, because the lot decides the price.

Request a written quote

Tell us the job

One vetted, insured North Texas contractor will call or text within one business day to set a time to look at it. You get a written quote with the full spec.

Written spec on every quote · No obligation

DrivewaysPatiosSlabsSidewalksCommercialStampedRepairCounties
ContactGet a quote